pool_resurfacing_OCT23 10/9-28/23
10OCT23 - My friend, Moses, who is the guy in charge of the pool resurfacing, called me on Sunday to say that they would be here on Monday to get started by…
As soon as the water level was below the steps, Rudy begain cutting and chipping away the old tile.
They drilled a couple holes in the bottom of the pool to let any ground water below, out. Knowing how high the table is around here, I fully expected a LOT of…
12OCT23 - The second crew showed up along with Rudy first thing yesterday and they wasted no time getting to work. Talk about a tedious job and running one of…
By quitting time, they had managed to get this far and what a mess.
13OCT23 - After a full day of chiseling away at the plaster, the three guys were almost able to finish yesterday.
They'll get the rest done today and remove all the debris. Then I'm told they will hit it with an acid wash followed by a pressure wash after which the plan is…
14OCT23 - Originally, the plan was to finish the pool before starting on the cool deck but the tile was delayed so the concrete guys started floating the new…
I took these shots around 1600 yesterday but they were able to finish the entire inner ring before dark. My guess is, they will continue with the outer ring…
Rudy finished a half day on Saturday after floating concrete around the top edge for the tile.
He was able to get it almost completed as you can see in this image. That will get finished on Monday and I suspect that the cool deck floating will also be…
20OCT23 - The guys spent the night locally and arrived a lot earlier than perviously which is a good thing and, they got right to work. First, they floated the…
Another two team members arrived and installed the new railing at the steps. Finally, they textured half the cool deck. So today I expect they'll finish that…
The tile we picked.
Rudy installing it.