|
|
After determining the mounting locations for the filter housings and getting them hung, I went to work building the copper manifold for the loop to the supply. Thanks to my good friend Al and his ideas, I got it right the first time with maximum utilization of valves and unions.
With this setup, I had the capability to shut off the water in multiple locations and that allows for both repair work and emergencies. (Thanks, amigo.) |
|
|